DC engineering
±500kV Yihua Line anti-dancing renovation project

内部精准十二码

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

内部精准十二码
Tel
内部精准十二码
Products
内部精准十二码
Sms
内部精准十二码
Contact